FAW-VW Audi Changchun X89 UB1 GEO, UB2 Core Line Project

Project Name:FAW-VW Audi Changchun X89 UB1 GEO, UB2 core line project
Project Location:FAW-VW Changchun Plant I
              It is AU 426 BIW production line that DLAT has undertaken from FAW-VW Audi Plant I. There are a total of four newly building automation line areas, including front floor, rear floor, front rail GEO, wheel cap inside and outside plate, water box, left and right door sill, A column GEO and repair welding. 25 stations and 87 robots are involved in. The automation rate reaches 85%; daily capacity is more than 600. Technologies such as point welding, FDS, Nieten, stud welding, turnover gripping, gluing and Buffer loading are being applied.