Project Name: BBAC MFAII welding workshop floor line project
Project Location:Beijing Benz Automative Co., Ltd Plant
BBAC Plant MFA II BIW production line project includes 4 newly built automation line areas, i.e. front floor, middle floor, rear floor and UB line. There are 257 robots and automation rate reaches 100%. Production capacity is 30JPH. This project applies point welding, gluing, projection welding, MIG welding, stud welding, online measuring, UB spot welding fixtures and 3+1 flexible switching units. It reserves NC-locator places for the 4th car model. Moreover turntable buffer, turnover fixtures, turntable fixtures, air buffer transfer, AGV and Pallet positioning are used in the project.
BBAC MFAII Welding Workshop Floor Line Project
Warning: Undefined array key "menu" in C:\xampp\web\submenuen.php on line 192
Warning: Undefined array key "menu" in C:\xampp\web\submenuen.php on line 192