Warning: Undefined array key "menu" in C:\xampp\web\subpageen.php on line 59

Warning: Undefined array key "menu" in C:\xampp\web\subpageen.php on line 59

Warning: Undefined array key "menu" in C:\xampp\web\subpageen.php on line 78

Deprecated: preg_replace(): Passing null to parameter #3 ($subject) of type array|string is deprecated in C:\xampp\web\lib\function.php on line 183
Svw Changsha Ub Ii

   SVW Changsha plant is located in Changsha Economic Development Zone with annual capacity of 300,000 vehicles.
   Dalian Auto-Tech undertook UB lIIine for its Body Shop.
   VW321/8CS New LAVIDA Facelift & VW378CS Touran NF UB II point welding line, capacity of 60 JPH,meanwhile reserved for follow-upassembly of SK376/1CS A+ SUV.
   VW321/8CS New LAVIDA Facelift & VW378CS Touran NF UB II repair welding line( line 1, line 2, line 3), capacity of 60 JPH, meanwhile reserved for follow-up assembly of SK376/1CS A+ SUV.

   Station 3010
   In this project, station 3010 is the station where robots are used mostly. This station includes 17 robots work together; 11 of them are welding robots, incl. 3 hanging robots, 3 GEO gripper robots, 3 handling gripper robots. Station cycle time is 51 seconds, incl. 16 seconds for transmission and 35 seconds for robots welding. In 35 seconds rear wheel caps(L&R) and radiator GEO can be finished.

   Station 3030
   Total 12 robots used to weld rear coaming, front and rear wheel caps GEO station, incl. 6 welding robots, 3 GEO gripper robots and 3 transmission grippers. All are operated in automatic transmission and loading way.